» » Periodic Inspections – Chain Slings

Periodic Inspections – Chain Slings

posted in: FAQs

Grade T (80) and Grade V (100) must have period inspections and the Australian Standard AS3775 includes a guide on how often these inspections should take place.  The guide is based on lift cycles (Per week), with 1 lift cycle equal to lifting and lowering a load once.

Number of Lift Cycles (per week)

1 to 5 = 12 monthly periodic inspection

6 to 25 = 6 monthly periodic inspections

26 to 200 = 3  monthly periodic inspections

201 plus = monthly inspections

For further information or clarification please contact RMB Lifting.